Close Menu
Business News MEA
    Facebook X (Twitter) Instagram
    Thursday, July 30
    Facebook X (Twitter) Instagram LinkedIn VKontakte
    Business News MEABusiness News MEA
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Business News MEA
    You are at:Home»Technology»FANR: Electrical generator fire outside Barakah Plant perimeter did not affect its safety, basic systems readiness
    Technology

    FANR: Electrical generator fire outside Barakah Plant perimeter did not affect its safety, basic systems readiness

    Editorial TeamBy Editorial TeamMay 17, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    ABU DHABI, 17th May, 2026 (WAM) — The Federal Authority for Nuclear Regulation (FANR) stated that it is continuing to closely monitor the incident involving a fire in an electrical generator located outside the inner perimeter of the Barakah Nuclear Power Plant in the Al Dhafra Region, caused by a drone strike.

    FANR confirmed that the incident did not affect the safety of the Barakah Nuclear Power Plant or the readiness of its essential systems.

    There has been no release of radioactive material, radiological safety levels remain within normal ranges, and there is no risk to the public or the environment. No injuries have been reported.

    FANR are maintaining close coordination with the plant operator and the relevant national authorities to verify all aspects of the incident and to confirm the continued integrity and readiness of plant systems.

    As part of its independent regulatory oversight, FANR is assessing the event in accordance with established national procedures and maintaining continuous monitoring of radiological conditions and plant status.

    The Barakah Nuclear Power Plant was designed, licensed, and is operated in accordance with the highest international standards of nuclear safety and security. Multiple independent layers of protection are built into every aspect of the plant’s design and operation to ensure the safe and secure production of clean electricity under a wide range of conditions.

    The protection of the public, workers, and the environment remains FANR’s highest priority. The Authority will continue to provide rigorous and independent regulatory oversight to ensure the continued safe and secure operation of the Barakah Nuclear Power Plant.

    FANR encourages the public to rely on official sources for accurate information and to avoid sharing rumours or unverified reports. Further updates will be provided as additional verified information becomes available.

    Source: Emirates News Agency

    Previous ArticleUAE continues its global excellence at conclusion of Abu Dhabi Grand Slam Jiu-Jitsu Championship
    Next Article Zayed Charity Run concluds first edition in Budapest

    Related Posts

    Sharjah Digital Department, Shams AI Club train staff on AI for media, marketing

    July 30, 2026

    RTA conducts comprehensive campaign to verify safety of Dubai Metro tunnel ventilation systems

    July 29, 2026

    OMODA 4 Makes Regional Debut at OMODA SUPER AI NIGHT, Bringing AI Mobility Closer to the UAE

    July 29, 2026
    Don't Miss

    Nasdaq Dubai records 33 fixed income listings worth $13.8bn in H1 2026

    Sharjah Digital Department, Shams AI Club train staff on AI for media, marketing

    Esha Oza congratulates UAE U19 team after World Cup qualification

    Ammar bin Humaid attends graduation of 24th National Service intake at Manama Training Centre

    2026. All rights reserved.
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.