Close Menu
Business News MEA
    Facebook X (Twitter) Instagram
    Thursday, November 5
    Facebook X (Twitter) Instagram LinkedIn VKontakte
    Business News MEABusiness News MEA
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Business News MEA
    You are at:Home»Technology»DEWA sets new world record with 0.82 minutes annual power disruption
    Technology

    DEWA sets new world record with 0.82 minutes annual power disruption

    Editorial TeamBy Editorial TeamApril 28, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    DUBAI, 28th April, 2026 (WAM) — Saeed Mohammed Al Tayer, MD and CEO of Dubai Electricity and Water Authority (DEWA), announced that DEWA has set a new world record for the lowest electricity customer minutes lost (CML), at just 0.82 minutes (about 49 seconds) per year.

    With this significant achievement, DEWA has surpassed its own previous world record of 0.94 minutes in 2024, representing an improvement of around 13%.

    “We utilise the latest technologies of the Fourth Industrial Revolution, particularly artificial intelligence, which we are fully integrating into DEWA’s strategies and operations,” Al Tayer said.

    He added that the smart grid is a fundamental pillar of DEWA’s strategy to deliver services according to the highest standards of availability, reliability and efficiency. This supports the Dubai 2040 Urban Master Plan and the Dubai Economic Agenda (D33), which seek to consolidate Dubai’s position among the top three global cities.

    Al Tayer explained that the Smart Grid, which DEWA is implementing with total investments of AED7 billion up to 2035, provides advanced features that enhance the efficiency of energy transmission and distribution, reduce outages, minimise losses, improve electrical load management and enhance the happiness of customers and all stakeholders.

    One of the key programmes is the Automatic Smart Grid Restoration System, the first of its kind in the Middle East and North Africa. The system enables remote, round-the-clock control, management and monitoring without human intervention, through innovative centralised systems that automatically locate and isolate faults and restore service, accelerating power restoration and increasing reliability.

    DEWA reduced CML in Dubai from 6.88 minutes per year in 2012 to just 0.82 minutes in 2025, significantly lower than the average of approximately 15 minutes recorded by leading utility companies in the European Union.

    Source: Emirates News Agency

    Previous ArticleSooryavanshi is supernatural: Pakistani commentator hits back at Indian media
    Next Article Sharjah’s women-only beach park set to open: Here’s everything you need to know

    Related Posts

    EDGE to explore integrating CMD engines into ADSB vessels

    November 4, 2026

    Singapore’s Terra Invest participates in strategic funding round for AI Company ‘AIREV’

    November 4, 2026

    Light + Intelligent Building Middle East marks milestone 20th edition, spotlighting convergence of building technologies

    November 3, 2026
    Don't Miss

    ICBA concludes knowledge exchange programme linking Dubai training with field application in Uzbekistan

    Ministry of Finance, IMF mission discuss UAE fiscal developments and outlook

    2nd Run for the Nation to take place in Abu Dhabi

    Designers from 50 countries present 40 projects at Dubai Design Week

    2026. All rights reserved.
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.