Close Menu
Business News MEA
    Facebook X (Twitter) Instagram
    Saturday, June 13
    Facebook X (Twitter) Instagram LinkedIn VKontakte
    Business News MEABusiness News MEA
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Business News MEA
    You are at:Home»Technology»SEWA launches new project to enhance water supply in Kalba
    Technology

    SEWA launches new project to enhance water supply in Kalba

    Editorial TeamBy Editorial TeamApril 9, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    SHARJAH, 9th April, 2026 (WAM) — Sharjah Electricity, Water and Gas Authority (SEWA) has begun operating a new project to enhance water supply in Kalba city. The project consists of a high-capacity strategic connection between TAQA’s resources and SEWA’s distribution network, ensuring that growing demand is met efficiently and effectively. The total cost of the project reached AED47,510,444.

    Engineer Yousef Al Hammadi, Director of Kalba Department at SEWA, stated that the project has achieved a significant transformation in Kalba by adding 3 million gallons of water per day to the network. This increased the city’s water distribution capacity from 6 million to 9 million gallons per day, representing a 50 percent increase in operational capacity.

    He noted that the project was implemented with funding of AED25,650,381 from SEWA and AED21,860,063 from the Initiatives Committee of His Highness the President of the UAE.

    The project operates at full capacity around the clock (24/7) to directly supply SEWA’s reservoirs. It includes an advanced engineering system to ensure continuous supply, as well as the extension of 14.75 kilometers of pipelines with a diameter of 400 mm, known for their high quality and pressure resistance.

    The project also incorporated advanced control systems and the installation of high-standard control valves to ensure reservoir stability and prevent sudden surges. Electrical works included completing excavation and laying essential cables within the station yard to ensure full technical integration.

    Al Hammadi confirmed that Kalba’s water network is now fully ready and operating at maximum capacity. The new infrastructure guarantees sustainable and reliable water supplies that meet current consumer needs and support the city’s future expansion plans, thanks to the effective collaboration between SEWA and TAQA.

    Source: Emirates News Agency

    Previous ArticleSlot admits Liverpool in ‘survival mode’ in PSG defeat
    Next Article Dubai becomes world’s first jurisdiction to establish dedicated guidance on virtual asset issuance

    Related Posts

    FREELANDER 8 Makes First Public Appearance Ahead of Official Abu Dhabi Launch

    June 13, 2026

    DEWA organises second Agentic AI Retreat at Al Shera’a

    June 12, 2026

    ADU, FertiClinic Group to launch reproductive research lab in Abu Dhabi

    June 12, 2026
    Don't Miss

    Palestinian football chief says was refused US, Canada World Cup visas

    UAE strengthens lead on day two of UAE National Jiu-Jitsu Championship

    Katy Perry, Tom Cruise: US brings glitz for World Cup 2026 opener

    UAE National Jiu-Jitsu Championship boosts competition through international ranking points

    2026. All rights reserved.
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports

    Type above and press Enter to search. Press Esc to cancel.