Close Menu
Business News MEA
    Facebook X (Twitter) Instagram
    Monday, September 14
    Facebook X (Twitter) Instagram LinkedIn VKontakte
    Business News MEABusiness News MEA
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Business News MEA
    You are at:Home»UAE»Abu Dhabi opens two bridges connecting Al Reem Island to Sheikh Khalifa Bin Zayed Highway
    UAE

    Abu Dhabi opens two bridges connecting Al Reem Island to Sheikh Khalifa Bin Zayed Highway

    Editorial TeamBy Editorial TeamMarch 21, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    ABU DHABI, 21st March, 2026 (WAM) — The Department of Municipalities and Transport (DMT) has announced the opening of two new marine bridges linking Al Reem Island directly to the Sheikh Khalifa Bin Zayed Highway (E 12).

    Designed to handle up to 7,200 vehicles per hour, this high-capacity route is expected to reduce travel times by 60 percent, or 15 minutes, during peak hours.

    The landmark AED450 million project streamlines journeys between the islands of Al Reem and Saadiyat, as well as the Dubai-bound highway (E-12). By easing congestion on Hamdan Bin Mohammed Street and Mina Road, the development significantly improves local traffic flow.

    A dedicated freight U-turn bridge between Zayed Port and Saadiyat Island has been included to enhance logistics connectivity and safety.

    “With this project, we are ensuring seamless mobility across Abu Dhabi, while showcasing our commitment to best-in-class design and sustainability standards,” said Eng Eisa Mubarak Al Mazrouei, Director-General of Infrastructure Development at the DMT.

    Spanning a combined length of 1.5km, the bridges – which cover a total surface area of more than 25,000 square metres – were delivered using advanced cast-in-situ box girder technology for strength and reliability, supported by 12 specialised V-shaped piers to allow vessels clear passage. Additional features include a 2km elevated roadway, 71 streetlights, landscaped spaces, and 2km of pedestrian and cycling tracks.

    The construction phase was completed in approximately 5 million manhours and used 35,000 cubic metres of concrete.

    Source: Emirates News Agency

    Previous ArticleThe pearl of Central Asia: The grand opening of the Islamic Civilization Center in Tashkent
    Next Article Former Dubai resident returns to fulfil a boy’s tennis dream

    Related Posts

    Ministry of Defence holds military funeral for two martyrs

    September 14, 2026

    ATM 2026 Future Stage opens with focus on AI’s role in rebuilding foundations of global travel

    September 14, 2026

    Arab Media Summit 2026 begins tomorrow in Dubai

    September 14, 2026
    Don't Miss

    Ministry of Defence holds military funeral for two martyrs

    Max Verstappen ‘seriously considered’ quitting Formula 1

    Seven new tourism board tie-ups headline a busy ATM opening for Emirates

    ATM 2026 Future Stage opens with focus on AI’s role in rebuilding foundations of global travel

    2026. All rights reserved.
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.