Close Menu
Business News MEA
    Facebook X (Twitter) Instagram
    Wednesday, October 28
    Facebook X (Twitter) Instagram LinkedIn VKontakte
    Business News MEABusiness News MEA
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    Business News MEA
    You are at:Home»UAE»SEWA installs 9,129 new smart water meters, replaces 9,734 from January to July
    UAE

    SEWA installs 9,129 new smart water meters, replaces 9,734 from January to July

    Editorial TeamBy Editorial TeamSeptember 6, 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    SHARJAH, 6th September, 2026 (WAM) — The Sharjah Electricity, Water and Gas Authority (SEWA) announced that it installed 9,129 new smart water metres and replaced 9,734 metres across various areas of the Emirate of Sharjah from January to the end of July 2026.

    The total number of smart water metres in the emirate has now exceeded 380,000. During the seven-month period, 39,746 metres were also tested at water metre laboratories to ensure their proper operation, as part of SEWA’s strategic plan to advance digital transformation and develop the water sector’s infrastructure.

    Engineer Faisal Al Serkal, Director of the Water Department at SEWA, said the project forms part of the Authority’s ongoing efforts to ensure measurement accuracy and enhance the efficiency of water services.

    He added that SEWA is committed to applying the highest quality standards to provide reliable services, enhance the efficiency of the water distribution network, improve service quality, protect natural resources and increase customer satisfaction.

    Al Serkal noted that key advantages of the new smart metres include accurate readings and the ability to detect abnormal water flows or leaks within properties, helping to prevent water wastage.

    He stressed that SEWA is committed to deploying the latest technologies to serve residents across the Emirate of Sharjah. Metre installation and replacement works are being carried out according to a specified schedule covering residential, commercial and industrial areas, with technical teams implementing the work in accordance with the highest quality standards.

    Source: Emirates News Agency

    Previous ArticleEmiratesGBC to launch ‘EmiratesGBC Energy and Water Benchmark’
    Next Article Infantino to seek re-election as Fifa president despite World Cup controversy

    Related Posts

    Department of Municipalities and Transport announces project linking Ramhan and Jubail Islands to Sheikh Khalifa bin Zayed Highway

    October 28, 2026

    Zayed International Airport, Air India Express to expand Abu Dhabi’s connectivity to two additional destinations in India

    October 28, 2026

    Ministry of Finance convenes Financial Data Forum 2026

    October 28, 2026
    Don't Miss

    Department of Municipalities and Transport announces project linking Ramhan and Jubail Islands to Sheikh Khalifa bin Zayed Highway

    FTA highlights experience in expanding smart tax systems at Belt and Road Initiative Tax Administration Cooperation Forum

    Zayed International Airport, Air India Express to expand Abu Dhabi’s connectivity to two additional destinations in India

    Ministry of Finance convenes Financial Data Forum 2026

    2026. All rights reserved.
    • Home
    • UAE
    • Business
    • Technology
    • Lifestyle
    • Sports
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.